Subcontracted BMB by IMPA - Full HPP Gruzza Project Contract.

Branimir M Brankovic has been   s  u  b  c  o  n  t  r  a  c  t  e  d  by Institute MIHAJLO PUPIN - Automatika (Belgrade, SERBIA) to complete full-scale project:

'DESIGN, CONSTRUCTION and COMMISSIONING of HYDRO POWER PLANT GRUZZA'

BMB has acted via his Sole Trade business registered in Serbia, as AUTHORIZED DESIGNER and INSTALLER. He has conducted every single task related to the project realization:

Initial Preliminary Design (Conceptual)

Project Planning & Management.

Construction Works - Earth, Civil, Mechanical and Electrical Engineering.

Turbine Design & Construction.

Turbine Manufacturing (a series of five), Delivery and Installation.

Full Design, with all legally required authorizations, consultations and certificates.

 

Contract has been absolutely fulfilled by BMB:

-the up-to-date Works commissioned and accepted by IMP-Automatika (on 13.12.).

-Main Design Book delivered on time (20.12.) and, subsequently (five days later) formally accepted by the Investor - City Assembly of Kragujevac SERBIA.